Categories
 
 
 
 
 
Age Verification
 
 

Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN

Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN

0 / 5 (0 reviews)
SKU:SFE09
Weight:0.35 kg
On stock 1 pc(s)
Best before15.12.2027
Imperial Baltic Porter, alc. 10,5%Read more
Available variants
Available in 1 variant
Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN330ml
Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN
Product Name: Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN
SKU: SFE09
Availability: In stock
1
You save: 11%
Old Price: 4,49 €
Product Price: 4,04 €
Availability
In Stock: 1
Availability: In stock
Your price: 4,04 € 4,49 €
Including VAT
Img
Odborné poradenstvo

Martin Majdlen

+421 948 450 100
(Po - Pia 8:00 - 15:30)

Sofia Electric Brewing 6 Months Behind Schedule 2026 edition | Imperial Baltic Porter

The 2026 edition of this modern Imperial Baltic Porter continues the tradition of Sofia Electric Brewing, ironically referencing the time-consuming nature of craft production each year. This season's recipe has undergone a significant evolution, aiming for an even deeper and darker profile than before. The main focus was on intensifying the dried-fruit character and the complexity of dark malts, elevating this potent special into the realm of truly delicate experiences. The result is a robust beer that blends the cleanliness of bottom fermentation with the sheer power of imperial styles.

The bouquet is filled with intense sensations, dominated by a strong aroma of raisins, dark molasses, and subtle roastiness. On the palate, the beer displays a viscous texture and a massive body, where layered notes of dried plums and figs take centre stage. Despite its strength, the liquid feels harmonious and warming, with the malty sweetness balanced by a velvety trace of dark chocolate. The finish is long and decadent, leaving a clean yet distinctly fruity resonance on the tongue that lingers long after the final sip.

 


Ingredients: water, BARLEY malt, OATS, WHEAT, hops, yeast.


0 / 5 (0 reviews)
(0 reviews)
 
 
Last viewed
Save: 10 %
0 / 5

Sofia Electric 6 Months Behind Schedule 2026 edition 330ml CAN

Imperial Baltic Porter, alc. 10,5%
Availability
In Stock: 1
Availability: In stock
4,04 € 4,49 €